Capabilities Portfolio
-
-
Construction and preparation of industrial engineering facilities for the installation of energy equipment
-
Pipeline installation for a mini-CHP plant based on cogeneration units (CGU)
-
Reconstruction of the flue gas system for the SN-250 solid fuel boiler with the installation of a double-barrel chimney, 40 m high
-
Overhaul of a steam boiler with a steam capacity of up to 80 t/h with the restoration of the steam supply system to the turbine
-
Installation and integration of a gas fire extinguishing system into the facility’s overall safety complex
-
Comprehensive electrical installation and start-up services for medium- and low-voltage grids
-
Integration of instrumentation and control systems (I&C) and automated process control systems (APCS) for cogeneration units