Overhaul of the screen system of the BKZ-210-140 boiler unit at Teplokomunenergo in Chernihiv

[ Year: 2025 ]

[ Country: Ukraine ]

[ Industry: Energy industry ]


Main task:

Perform a complete replacement of the furnace refractory lining to restore its operability, increase reliability, and ensure stable operation of the unit.


Customer feedback:

The results of the work received a positive evaluation from the customer. The company highlighted the high quality of project implementation, compliance with deadlines, and the team's professional level. Based on the cooperation results, Inventum Ukraine is recommended as a reliable contractor for performing similar energy equipment installation and repair work.

Watch review

Key features:

  • CC3 consequence class facility (significant consequences);
  • execution of work within tight deadlines, taking into account equipment shutdown schedules;
  • carrying out repairs within an operating enterprise.


Implementation:

  • major overhaul of the boiler screen system elements was completed;
  • mechanical installation work was carried out in accordance with design documentation;
  • compliance with occupational health and industrial safety standards was ensured;
  • the boiler unit was commissioned.

Result:

Operability of the boiler screen system has been restored.