Implementation of INNIO Jenbacher cogeneration plants with a total capacity of 19 MW

[ Year: 2025 ]

[ Country: Ukraine ]

[ Industry: Energy industry ]

Main Task:

Ensuring continuous production of electrical and thermal energy from a single fuel source (natural gas) while achieving maximum efficiency and effective utilization of energy resources.

Features:

  • implementation of decentralized generation facilities under limited energy resources;
  • integration of cogeneration equipment into the existing energy infrastructure;
  • comprehensive utilization of thermal energy generated during engine operation;
  • ensuring high efficiency of equipment operation under variable loads.

Implementation:

Installation of main equipment:

  • installation of INNIO Jenbacher gas engine cogeneration units;
  • installation of a waste heat boiler for recovery of thermal energy from flue gases.

Engineering systems:

  • piping of cooling systems (water, oil) completed;
  • flue gas exhaust system installed;
  • installation of heat exchange and auxiliary equipment.

Service infrastructure:

  • manufactured and installed crane runway structures and overhead cranes with remote control.

Result:

Efficient operation of cogeneration units has been ensured with simultaneous production of electrical and thermal energy.

Through heat recovery from:

  • flue gases;
  • engine cooling systems;
  • lubrication systems.

feedback

Need a consultation?

Fill out the form - and we will contact you shortly.