Installation of a 40 MW thermal energy generation facility

[ Year: 2023 ]

[ Country: Ukraine ]

[ Industry: Energy industry ]

Task:

installation of a set of thermomechanical and other equipment for a heating plant with a total capacity of 40 MW.

Peculiarities:

  • work was carried out around the clock with more than 90 qualified specialists and engineers;
  • 5 units of lifting and other equipment were involved;
  • total weight of the installed equipment: more than 500 tons;
  • total lining weight: more than 320 tons.

Implementation:

  • installation of furnaces AXIS SAX-24 SZ;
  • installation of pumping and heat exchange equipment;
  • installation of two DANSTOKER TVBH-F P-20 MW boilers;
  • installation of internal pipelines (boiler piping);
  • installation of ash and slag removal equipment;
  • installation of multicyclones;
  • installation of transport equipment;
  • lining of boiler furnaces;
  • installation of external thermal insulation and sheathing of the equipment structure (furnaces AX-24, multicyclones, etc.).

Result:

the entire scope of work was performed professionally, in full and in a short time.

feedback

Need a consultation?

Fill out the form - and we will contact you shortly.