Installation of blocks of two single-stage furnaces

[ Year: 2023 ]

[ Country: Ukraine ]

[ Industry: Energy industry ]

Task:

installation of blocks of two single-stage furnaces with a thermal capacity of 6.5 MW each (total weight 220.0 t).

Realization:

  • installation of two water pipe heat exchangers;
  • installation of metal structures of furnace units with dry ash removal;
  • installation of two flue heat exchangers (water heaters);
  • installation of metal structures of the chimney frame;
  • installation of a chimney pipe;
  • installation of two economizers;
  • installation of metal structures of two multicyclones;
  • installation of two filter units (sleeve filters);
  • installation of metal constructions of stairs, platforms and gas pipes;
  • installation of metal structures and fuel storage hydraulics with conveyors to furnaces and fuel supply devices;
  • installation of two sets of auxiliary furnace equipment (smoke extractor, fans, ash containers, airlocks, feed and discharge screws, hydroelectric power stations);
  • installation of support structures, pipelines, equipment and components of two furnaces;
  • installation of lining and thermal insulation of two single-stage furnaces.

Result:

the entire scope of work was performed professionally, in full and within the stipulated time.