Insulation of boiler equipment

[ Year: 2023 ]

[ Country: Ukraine ]

[ Industry: Energy industry ]

Task:

insulation of furnace equipment as part of the project to switch furnaces to alternative fuel.

Watch review

Realization:

  • installation and insulation of pipelines of weakly heated air, dust pipes, dust collectors;
  • walling of the inner surface of burner embrasures and external insulation of burners;
  • development, design, installation of the automated process control system (APCS), control and measuring devices, actuators, including proprietary software;
  • a fire-extinguishing pumping station was built;
  • a full set of materials and equipment was completed.

Result:

the entire scope of work was performed professionally, in full and within the stipulated time. A letter of recommendation was received from the customer 