Result:
all works were completed in accordance with the regulations, in full scope, and within the established timeframe.
In January-February 2012 specialists of the company have executed mounting of lining of gas diverting channels of site of refinement and alloying of lead. As a main material boards based on ceramic fiber Superwool Plus Blok 1000 and Superwool Plus Blok 800 had been used. These materials are characterized by durability, lightweight, resistance to thermal shocks and water-repellent properties (for prevention of absorption of water or binding concrete solutions).
all works were completed in accordance with the regulations, in full scope, and within the established timeframe.