Result:
The operation of the steam boiler with a steam capacity of up to 80 t/h has been restored and a stable steam supply to the turbine has been ensured. The equipment was commissioned from the first launch without additional modifications.
The operation of the steam boiler with a steam capacity of up to 80 t/h has been restored and a stable steam supply to the turbine has been ensured. The equipment was commissioned from the first launch without additional modifications.