Result:
all works were completed in accordance with the regulations, in full scope, and within the established timeframe.
Thermal insulation of the pulp dryer drum was carried out in the shortest possible time in compliance with all requirements and standards. Blanket materials based on LYTX-212 ceramic fiber were used as thermal insulation, which significantly reduced the overall weight of the drum structure and decreased the load on its drive mechanisms. Galvanized steel sheet was applied as a protective cladding layer to ensure reliable protection of the insulation against mechanical damage and atmospheric influences.
all works were completed in accordance with the regulations, in full scope, and within the established timeframe.