Result:
all works were completed in accordance with the regulations, in full scope, and within the established timeframe.
In July 2010 the specialists of our company carried out the works on thermal insulation of the steam lines with a temperature of 150 0С. For the insulation of steam lines it had been decided to clean the surface of the pipe beforehand and cover it by the heat-resistant anti-corrosion enamel KO-828. After that to isolate the steam pipe by the multilayer insulation:
Work on thermal insulation of the steam line 144 m in length, including the dismantling of the old isolation, had been carried out by our 3 (three) experts in 19 (nineteen) days. The materials used have confirmed their excellent thermal insulation properties.
all works were completed in accordance with the regulations, in full scope, and within the established timeframe.