[ Industry: Production of ceramics and building materials ]
Task:
repair of the lining of the heat exchanger of the afterburner on production lines No. 1 and No. 2;
thermal insulation of air ducts and heat exchanger of production line No. 1 and sections afterburner unit's heat exchanger casing sections on production line No. 1.
production and installation of anchors and bandages for fixing thermal insulation materials;
installation of high-temperature thermal insulation materials;
installation of LYTX ceramic fiber mats;
manufacture, supply and installation of LYTX-1140M ceramic fiber modules of various standard sizes.
Result:
work was performed in accordance with contractual obligations, in two shifts and within a short time frame (10 and 14 calendar days for each production line, respectively);