to perform the repair in a short time frame (within 14 days).
Implementation:
dismantling of the old lining;
delivery of materials;
installation of a new lining (heat-insulating layer, which is blankets made of ceramic fiber and a refractory layer, fire-brick laying with a volume of 19 cubic meters);